Equinor All Electric System – Engineering and Development
Key development objectives:
- Reduce cost of Subsea Production Systems
- Minimize system complexity
- Improve reliability and increase production availability
- Improve functionality
- Optimize condition monitoring, operation validation and control
- Improve Safety and Environmental impact
- Industry readiness by 2021 (TRL4)
